Combined cold storage installation (PU board eccentric hook) process
发布时间:
2016-12-02
Yanghu Refrigeration Engineering Picture The most important thing in cold storage installation is to be able to do the most basic things well, and to be able to put yourself in the customer's shoes. Yanghu Refrigeration, as China's leading high-quality supplier of energy-saving thermal insulation and environmental protection board industry, has unique insights in cold storage installation. Below, the editor of Yanghu Refrigeration will introduce you to the relevant knowledge of cold storage installation. 1. Preparation before installation of construction steps 1. After the vehicle transporting the warehouse board arrives at the construction site, it should be unloaded in an organized manner, and neatly stacked according to the type and size of the warehouse board, and the ground and each layer of the warehouse board should be placed to prevent scratches injury protection material. During unloading and stacking, it should be light

Pictures of Yanghu Refrigeration Project
The most important thing in cold storage installation is to be able to do the most basic things well, and to be able to put yourself in the shoes of customers. Yanghu Refrigeration, as China's leading high-quality supplier of energy-saving thermal insulation and environmental protection board industry, has unique insights in cold storage installation. Below, the editor of Yanghu Refrigeration will introduce you to the relevant knowledge of cold storage installation.
1. Construction steps
Preparation before installation
1. After the vehicle transporting the warehouse board arrives at the construction site, it should be unloaded in an organized manner, neatly stacked according to the type and size of the warehouse board, and anti-scratch protection materials should be placed between the ground and each layer of the warehouse board. In the process of unloading and stacking, it should be handled with care, and violent handling such as throwing, dragging, etc. is strictly prohibited to avoid scratches on the warehouse board and the outer protective film; the appearance quality of the warehouse board should be checked; Poor library boards are stacked separately and marked.

Stacked neatly
2. Statistics and acceptance of the library board
According to the purchase order details and design drawings provided by the design department or the supply department, arrange a special person to count the number and specifications of the warehouse boards that have arrived, check the appearance and density of the warehouse boards and make records; the warehouse boards with serious quality defects should be timely. Report to the project manager or the on-site technical person in charge, and make a decision to exchange or allow the use.

Load carefully
3. Floor insulation construction
The cold storage is different from the general industrial and civil buildings. The temperature difference inside and outside the cold storage and the water vapor partial pressure difference affect the normal operation of the cold storage. It is necessary to do a good job in the air insulation and moisture proof and thermal insulation of the floor; after the construction personnel arrive at the construction site, they should carefully check the Design drawings, check whether the underground ventilation ducts meet the drawing design, whether the air barrier and moisture-proof layer are flat and complete, whether the dimensions meet the drawing requirements, and whether the density and external dimensions of the thermal insulation material XPS meet the drawing requirements and product specifications. When laying the XPS insulation board, it should be arranged in staggered seams. If the gap is too large, foam material should be used. The wall panel installation slot should be straight, and the debris should be cleaned up. The construction of reinforced concrete should be carried out in strict accordance with the technical requirements of the drawings to ensure the long-term and safe operation of the cold storage.
On-site warehouse installation
4. Inspection and preparation of construction site
Prepare tape measure, spirit level, wire rope, transparent plastic pipe and other tools and aids, and check the construction accuracy of the ground or thermal insulation floor at the construction site against the design drawings, including flatness, dimensional accuracy and standard accuracy of the warehouse area; The embedded parts and pre-buried pipelines shall be well protected and clearly marked; the wall panel installation grooves shall be thoroughly cleaned, and the groove errors shall be corrected with the cooperation of civil construction personnel.

5. Preparation of construction equipment and auxiliary materials
According to the actual situation of the construction site, prepare construction equipment and tools such as hydraulic lifting trolleys, scaffolding, safety belts, safety helmets, etc., and draw out various auxiliary materials used on duty according to the construction progress.
6. Construction organization
All personnel on the construction site should wear the work clothes uniformly distributed by our company and wear necessary protective equipment; all working surfaces should obey the unified command of the on-site commanders and work closely together.
Second, the installation and construction instructions of the library body
Library board basic installation part
1. According to the design drawings, if there are supporting beams, columns and supporting steel frames designed in the warehouse, the lines should be positioned according to the requirements of the design drawings, and accurate and clear signs should be made; the supporting beams, columns, and supporting steel frames should be welded or installed. Welding joints shall be treated with moisture-proof and anti-corrosion according to the requirements of the drawings.
2. The equipment that needs to be installed in the warehouse and needs to enter the warehouse in advance shall be installed in place or placed in a proper position in the warehouse;

Installation of cold storage doors
3. Install the temporary lighting facilities in the warehouse, install and arrange the construction electrical equipment, and do a good job of safety protection such as rainproof, moistureproof, anti-collision, and anti-puncture.
4. Install the wall storage board from the corner of the storage body, fix it with a "U"-shaped positioning groove, and the positioning groove arrangement direction is perpendicular to the floor seam of the cold storage. Use an Allen key to twist the hook to connect the hook to the pin.
After the cold storage installation is completed,
Condensation sometimes occurs before the concrete base dries out. In the rainy season and other times when the humidity is abnormally high, condensation will occur on the joints of the warehouse board, and in small cases, condensation will also occur on the refurbished warehouse board. The above is the relevant knowledge of cold storage installation. Today, I have introduced so much to you. I don’t know how much you know. If you have any other questions, welcome to Yanghu Refrigeration!